Pump out pool water level to 6-8" below skimmer
Drain water from and blow out all associated pool equipment (pump, filter, heater, chlorinator, etc.)
Blow out all suction and return lines
Blow out and winterize slide if applicable
Add foam rope to and seal all lines airtight with appropriate plugs
4 litres antifreeze added to suction line and skimmer (included)
Skimmer protected with foam and/or empty plastic bottles
Remove lights to pool deck and cover
Remove cartridge filters if applicable
Disconnected, unplug and drain UV system if applicable
Place winter cover and fill water bags
Install safety cover if applicable
Solar cover rolled up and protected with poly-wrap for the winter
Pump out pool water level to 6-8" below skimmer
Drain water from and blow out all associated pool equipment (pump, filter, heater, chlorinator, etc.)
Blow out all suction and return lines
Blow out and winterize slide if applicable
Add foam rope to and seal all lines airtight with appropriate plugs
4 litres antifreeze added to suction line and skimmer (included)
Skimmer protected with foam and/or empty plastic bottles
Remove lights to pool deck and cover
Remove cartridge filters if applicable
Disconnected, unplug and drain UV system if applicable
Place winter cover and fill water bags
Install safety cover if applicable
Solar cover rolled up and protected with poly-wrap for the winter